Sarasota City Building Permits

    Sarasota City’s building permit process ensures that all construction and renovation projects meet the safety, quality, and resilience standards outlined in the 2023 Florida Building Code (FBC). Whether you are building a new home, remodeling, or adding an accessory structure, permits verify compliance with structural, electrical, mechanical, and environmental regulations. This guide explains how to navigate Sarasota’s permitting process from application to final inspection. It also covers milestone inspections, flood zone compliance, and practical tips to help you avoid costly delays when working within city limits.

    Permitting Process

    Permits are required for:

    New construction (homes, commercial buildings).

    Renovations (structural, electrical, plumbing).

    Repairs (e.g., roof replacements, HVAC upgrades).

    Applications are submitted via City of Sarasota Development Services, requiring:

    Detailed plans and specifications.

    Contractor licensing verification.

    Neighborhood association affidavits (e.g., Bird Key).

    Processing typically takes 5–15 business days, depending on project complexity.

    Milestone Inspections

    Effective January 1, 2025, milestone inspections will be required for certain buildings, including condominiums that are more than 30 years old or three stories or taller. Property owners must submit their inspection reports through the City of Sarasota’s online portal. For more information, contact Macy Grochowski at Macy.Grochowski@sarasotafl.gov.

    Milestone Inspections

    Flood Zone Requirements

    Sarasota’s coastal location mandates strict flood zone rules, per FBC R322.1.6:

    Elevate structures and appliances (e.g., HVAC units) above base flood elevation.

    Use flood-resistant materials below elevation levels.

    Obtain flood insurance for FEMA flood zone properties.

    Check flood zones at Sarasota County.

    Practical Tips

    Verify Contractors

    Ensure licensing via DBPR.

    Submit Complete Plans

    Incomplete applications delay approvals.

    Plan for Inspections

    Schedule early to avoid delays.

    Review Local Rules

    Check neighborhood association requirements.
    Practical Tips

    FAQs

    What projects need permits?

    New construction, renovations, and major repairs.

    When do milestone inspections start?

    January 1, 2025.

    How do I check flood zone status?

    Use Sarasota County.